Hero

Our achievements
NCT Transports renovates and secures their maintenance pits with Xpertive

TRANSPORTS NCT:

Custom-made creation of 2 garage pits and their motorized aluminum covers 25 T/m2

Before
BEFORE
After
AFTER

July 2026

A complex renovation, a solution in just 7 days

For Transports NCT, Xpertive transformed a heavy-duty maintenance workshop equipped with obsolete concrete pits and unprotected concrete walls into a safer, more modern and efficient space.

Our mission: to find a solution Secure the pits, Modernizing the workshop and improving its efficiency, without permanently immobilizing the activity.

How to renovate a heavy-duty maintenance workshop without permanently immobilizing its activity?

This is the challenge faced by Xpertive® in Saint-Romain-de-Jalionas.

Facing old, unprotected and unsuitable concrete pits for today’s needs, we assisted the project manager in defining a new configuration.

Our solution

We have proposed and installed 2 prefabricated pits with covered motorized pits capable of supporting 25 T/m², This allows the pits to be secured when they are not in use and to facilitate their daily use.

2
Prefabricated sewer pipes
25 T/m²
RESISTANCE
7 DAYS
INSTALLATION

A considerable time saving

The choice of prefabrication has radically changed the project's schedule: Only 7 days of intervention, compared to approximately 8 weeks for a traditional concrete construction.

87,5 %
TIME SAVED

7 days instead of 8 weeks : less downtime and a much faster return to service for the workshop.

The result

A safe workshop pit, a significantly shortened construction period and a workshop that was quickly operational.

✓ Enhanced security

✓ A construction site 87.5 % % shorter

✓ A quick return to service

✓ A more efficient workshop

Xpertive® : much more than a provider of pit covers, a provider of solutions to secure, renovate and optimize heavy-duty maintenance workshops.

SECURE THE WELL
SPEED UP THE CONSTRUCTION SITE
OPTIMIZING THE WORKSHOP

Xpertive transforms technical constraints into effective solutions.

 

Result after

From 8 weeks to 1 week: a pit renovation designed for the safety and performance of the workshop

Xpertive has customized renovated and secured the 2 heavy-duty workshop pits of this carrier
Contact us for your bespoke projects
Brochures Xpertive

OUR BROCHURE

DISCOVER OUR SOLUTIONS
BY DOWNLOADING OUR BROCHURE

BROCHURE REQUEST